How Implementation Works

From Enquiry to Line Start-Up

Five stages that take you from first contact to a running GRB2 880.264 line in your facility — covering audit, design, FAT testing, and operator training.

Two GRB2 880.264 Nawrocki Pellet Mills pelleting lines running in a factory
1

Needs Analysis & Audit

A technical conversation about raw material, target throughput, and installation conditions. If the investment is to qualify for white certificates, an energy audit is planned at this stage as well.

1 – 2 weeks
2

Design & Quotation

Selection of the GRB2 880.264 variant, configuration of ancillary machines, and preparation of a detailed technical and commercial offer.

2 – 3 weeks
3

Production & FAT Testing

Machine build at the factory in Żnin and Factory Acceptance Test (FAT) before dispatch — with the option for the customer to attend.

3 – 6 months
4

Delivery, Installation & Training

Transport to the customer's facility, line installation by Nawrocki engineers, and operator training covering operation and basic diagnostics of the GRB2 880.264.

2 – 4 weeks
5

Service & Warranty (NPT ServicePlus)

36-month warranty and an optional ServicePlus package with scheduled maintenance and service support in your EU country.

Entire service life
Questions & Answers

Frequently Asked Questions

How long does an GRB2 880.264 order take to fulfil?

Approximately 3 – 6 months from contract signing to line start-up — depending on the machine configuration, production availability, and the scope of installation work at the customer's site.

Does Nawrocki provide operator training?

Yes. Training in the operation, basic diagnostics, and maintenance of the GRB2 880.264 is included in the implementation process and takes place during line installation at the customer's site.
Ready for the Next Step?

Start the GRB2 880.264 Purchase Process