Return on Investment Calculator

Return on Investment Calculator

Compare your pellet mill with the GRB2 880.264 — see the difference in energy consumption, production time, and white certificate value. Data based on coniferous biomass.

01Your Output (t/h, working hours)
02Your EU Country — White Certificates
03Energy & Pellet Price in Your Country
1

Your Output (t/h, working hours)

Die inner diameter mm
Total main motor power kW
Average actual throughput t/h
2.0 t/h
Work Schedule
Working days / week days
5 days
Working hours / day h
16 h
Total hours / week
80 h / week
I have my own real data — enter manually (kWh/t and/or annual output)
Your energy consumption kWh/t (optional)
Average annual output t (optional)
2

White Certificates — Your EU Country

EU Country
Results displayed in currency PLN
Currency changes with country selection above
3

Energy & Pellet Price per Tonne in Your Country

Cost per kWh PLN / kWh
0.75 zł
Average net price per tonne of pellet PLN / t

GRB2 880.264 vs Your Pellet Mill

Coniferous biomass

Parameter GRB2 880.264 · Biomass · Nawrocki3 rollers · New generation of efficiency Your Pellet Mill2 rollers
Installed power 264 kW 2×132 kW 160 kW
Throughput (output) 4.0 t/h 2.0 t/h
Energy per tonne of pellet 66 kWh/t 80 kWh/t
Energy Cost Savings
GRB2 880 Pellet Mill
3 rollers · Nawrocki
66
kWh / t
Your Pellet Mill
2 rollers
80
kWh / t
% Less Energy with GRB2 880.264
18%
Savings Per Year
87,360 zł
With the GRB2 880 pellet mill you will save 18% energy on every tonne of pellet, which at your annual output means 87,360 zł net savings per year.
Your New Annual Output with Identical Working Hours (4,160 h/year)
16,640 t
GRB2 880.264Nawrocki
8,320 t
Your Pellet Millcurrent output
+8,320
Additional Tonnes of Pellet / Year
Result: Annual Energy Savings
— zł
Result: White Certificate Value
— zł
Sawdust pellets produced on the Nawrocki GRB2 880 pellet mill
Fewer Hours, Same Output

The Same Annual Pellet Volume — Faster

The GRB2 880.264 will produce your current annual pellet volume in significantly less time. Instead of running 24/7, you can return to a standard working week.

Your Current Schedule
5days / week
16 h / day · 80 h / week
vs
Same Volume on GRB2 880.264
5days / week
8 h / day · 40 h / week
Fewer Working Hours / Year
2,080hours
Fewer Working Days / Year
130days
Labour Cost Savings / Year
— zł
Enter gross cost per operator / shift hour
PLN / h
Default is a typical rate — edit to match your own costs
Number of operators employed (all shifts)
persons
Total number of operators running the pellet mill across all shifts

Results are indicative, based on user-supplied data and GRB2 880.264 reference parameters for coniferous biomass. They do not constitute a quotation or guarantee — final figures require an energy audit.